Planning an extension and adding a storey: structural engineering from the start
Whether extension, additional storey, loft conversion or dormer: I first check what your house can carry and what building law allows. Then I plan so that design and structure fit together.
Extension design package €5,355 to €11,305 incl. VAT
Dipl.-Ing. Robin Henn, civil engineer · structural calculations to Eurocode, ready for checking · Reply usually within 24 hours on working days
Extension design package
€5,355 to €11,305 incl. VAT
From the preliminary design to the permit application (work stage 4), depending on size and the existing building. Submission is taken on by a partner who is a member of the chamber of architects; the partner’s share is shown separately in the quotation.
What you receive
- Site visit with measured survey and a look at the structure
- Clarification of what the local development plan (Bebauungsplan) and the required boundary clearances allow
- Preliminary design in options with a cost framework
- Design with floor plans, sections and elevations
- Structure planned in from the start: foundations, connection to the existing building, openings
- Permit application; submission is taken on by a partner who is a member of the chamber of architects
- Written quotation with a fixed price before any costs arise
Time frame: First assessment usually within 24 hours on working days.
Note under § 7 HOAI: a fee higher or lower than the values in the HOAI 2021 fee tables may be agreed. Without an agreement in text form the basic fee rate applies.
From the first sketch to the start of construction
-
Send your project
You send photos, the address, the year of construction and a sketch of what you have in mind. I tell you, usually within 24 hours on working days, which route is possible.
-
Site visit and structure
I take measurements and check walls, floors and foundations. For an additional storey this is where the preliminary structural check takes place, for an extension the look at boundary distances and the local development plan.
-
Preliminary design with a cost framework
You receive options with floor plan, structure and a first cost range, and decide which one is taken further.
-
Design and permit
The option you choose becomes the design. Submission is taken on by a partner who is a member of the chamber of architects; the building application goes to the building authority electronically.
-
Structural calculation and drawings for the site
For construction, you and your builders receive the structural calculation and details for the shell, the carpenter and the steel fabricator. I answer questions from site directly.
Extension, additional storey or loft conversion: which route fits?
More living space is created in three ways: beside the house, on top of the house or under the roof. Anyone who wants to plan an extension or add a storey therefore first clarifies plot, structure and roof shape.
| Route | What it depends on | What I check first |
|---|---|---|
| Extension | Space on the plot, distance to the boundary, local development plan | Foundations next to the existing building, opening in the external wall |
| Additional storey | Reserves in walls, floors and foundations | Path of the new loads down into the ground |
| Loft conversion | Room height, roof shape, floor beneath the roof | Load-bearing capacity of the floor, rafters, space for a dormer |
You will find the detailed comparison in the article Extension, additional storey or loft conversion (in German).
Conversion and structure: why the calculation comes first
With each of these routes the new intervenes in the old. The extension needs an opening in the external wall and a foundation that settles differently from the old one. A new storey sends its load through walls that were never designed for it. That is why I calculate before I draw.
For the opening between the old building and the extension the same applies as for any wall opening: beam, bearings and temporary propping are calculated, not estimated.
Adding a storey: what the preliminary survey clarifies
Whether a house can carry a further storey is decided by walls, floors and foundation. I survey the existing building, determine the loads and calculate which reserves are available. An additional storey in timber is lighter than one in masonry and therefore more often manages without strengthening.
Since 1 September 2026 the building code of North Rhine-Westphalia (BauO NRW) has made the first addition of one storey easier if living space is created in the process. Many of today’s requirements for walls, floors, roofs and stairs then do not apply to the existing building elements (section 47 (7) BauO NRW). The second escape route must nevertheless be demonstrated, and the house has to carry the new load in any case. What the building work costs is set out in the article Adding a storey: the costs (in German).
Loft conversion and dormer: height, floor, rafters
In a loft conversion the height decides first: in North Rhine-Westphalia, habitable rooms in the roof need a clear height of at least 2.20 m over at least half of the floor area of the room. Then comes the floor. It was often designed only for a storage attic, not for screed, bathroom and furniture.
A dormer, that is, a projection from the roof with a vertical window, interrupts several rafters, the sloping timbers of the roof. Their load is taken up by a trimmer, a cross timber that distributes it to the neighbouring rafters. I calculate this and draw the details for the carpenter. Whether the dormer needs a procedure depends on the bylaw of the municipality; more on this in the questions below and in the article Loft conversion: costs and permit (in German).
What do design and structural engineering cost for an extension, an additional storey and a dormer?
Four services have fixed prices:
| Service | Content | Price incl. VAT |
|---|---|---|
| Extension design package | Preliminary design to permit application; submission through the partner, the partner’s share shown separately | €5,355 to €11,305 |
| Preliminary structural check for an additional storey | Can walls, floors and foundations carry a further storey? | €1,785 |
| Preliminary survey for an additional storey | Survey of the existing building, determination of loads, reserves; scope depending on the house and the documents | €1,428 to €2,856 |
| Dormer | Structural calculation and detailed design | from €4,165 |
What is included in detail and where your project lies within a range is set out in the written quotation. I offer detailed design and site supervision under the HOAI 2021, the German fee scale for architects and engineers. The building costs come on top: for an extension, specialist portals and providers give €1,400 to €3,500 per square metre for the building work alone (as of 2026). A breakdown is given in the article What an extension with a building application costs (in German).
Do I need a building permit for an extension, an additional storey or a loft conversion?
The building code of North Rhine-Westphalia provides for three routes. Which one applies depends on the project and on the plot:
- Exempt from the permit procedure are, among other things, patio roofs up to 30 m² in area and 4.50 m in depth, and conservatories up to 30 m² on buildings of building classes 1 to 3 if they keep a distance of 3 m from the boundary.
- Notification procedure (Genehmigungsfreistellung): in the area of a local development plan it is enough to submit the documents if the project complies with the plan. If the municipality does not require a permit procedure, construction can start one month after receipt. For converting the loft into living space this also applies in a built-up district without a local development plan.
- Simplified procedure: in all other cases a building application is submitted, since September 2026 electronically. The authority checks within ten working days whether it is complete. Once all documents and consultation responses are in, it decides within six weeks.
An extension with living space and an additional storey belong to the second or third route. The permit application is then taken on by a partner who is a member of the chamber of architects. In addition, the proof of structural stability (Standsicherheitsnachweis) must be available by the start of construction at the latest. The building code of North Rhine-Westphalia requires it to be prepared by a registered qualified structural designer. Who that is in your case is stated in the quotation. Whether a preliminary building enquiry (Bauvoranfrage, article in German) is worthwhile beforehand, I tell you after the site visit. As of October 2026, building code of North Rhine-Westphalia in the version of 1 September 2026. In each case the building authority decides.
What I am not the right person for
- I do not submit the building application myself. A partner who is a member of the chamber of architects takes this on; the partner’s share is shown separately in the quotation.
- I do not design or sell extension modules and conservatories from a catalogue. For those the manufacturer is the right contact.
- I do not design an additional storey without a preliminary check of the structure. A design is only worthwhile once it is established what walls and foundations can carry.
- Nobody can promise that the authority will grant the permit. I clarify beforehand what the local development plan allows and, if in doubt, advise a preliminary building enquiry (Bauvoranfrage).
Questions about extensions, additional storeys and loft conversions
Can my house carry an additional storey?
A preliminary structural check shows this: I check walls, floors and foundations for the additional loads and say what strengthening would be needed. It costs €1,785 including VAT. After that you know whether a design is worthwhile.
What does it cost to have an extension designed?
The extension design package costs €5,355 to €11,305 including VAT, depending on size and the existing building. It runs from the preliminary design to the permit application (work stage 4). Submission is taken on by a partner who is a member of the chamber of architects; the partner’s share is shown separately in the quotation. I state the binding price in writing before any costs arise.
What does an extension cost in total?
The building costs come on top of the design. Specialist portals and providers give €1,400 to €3,500 per square metre for the building work alone and €3,000 to €5,000 per square metre for turnkey extensions (as of 2026). Small extensions cost more per square metre. A range for your project is given in the cost framework that comes with the preliminary design.
Do I need a building permit for an extension?
If living space is created, as a rule yes. If the plot lies in the area of a local development plan (Bebauungsplan) and the extension complies with its requirements, the notification procedure (Genehmigungsfreistellung) is a possibility; otherwise the application goes through the simplified procedure. Among other things, patio roofs up to 30 m² in area and 4.50 m in depth are exempt from the permit procedure. As of October 2026, building code of North Rhine-Westphalia in the version of 1 September 2026; in each case the building authority decides.
Can a dormer be built without a permit?
Only in certain cases. A dormer is exempt from the permit procedure if a municipal bylaw regulates permissibility, location and size, the dormer complies with it and its structural soundness is certified (section 62 of the state building code, BauO NRW, as of October 2026). For this, the building code of North Rhine-Westphalia requires a certificate from a registered qualified structural designer. Who issues it in your case is stated in the quotation. In all other cases the dormer goes through the building authority, in the notification procedure (Genehmigungsfreistellung) or in the simplified procedure.
What room height does a loft conversion need?
In North Rhine-Westphalia, habitable rooms in the roof need a clear height of at least 2.20 m over at least half of the floor area of the room. Parts of the room up to 1.50 m high are not counted (section 46 of the state building code, BauO NRW, as of October 2026). In addition there is the second escape route and the question of whether the floor can carry residential loads. I check the floor by calculation.
Who submits the building application and how long does it take?
The permit application is taken on by a partner who is a member of the chamber of architects; the building application goes to the building authority electronically. In the simplified procedure the authority decides within six weeks once the documents are complete and all consultation responses are in. If it does not decide, an application submitted since 1 September 2026 is deemed approved after three months, according to guidance from the professional chambers (Baukammern). As of October 2026, building code of North Rhine-Westphalia in the version of 1 September 2026.
When should the structural engineering come in?
Before the first design. Thinking about the structure from the start avoids redesign and beams that later no longer fit into the floor. For an additional storey and a loft conversion, the structural analysis even decides whether the project is possible at all.
Do you also do the detailed design and accompany the construction?
Yes, if you wish. Detailed design, tendering and site supervision are not part of the design package and are quoted under the German fee scale for architects and engineers (HOAI 2021). In that case a fee higher or lower than the values in the fee table may also be agreed; without an agreement in text form the basic fee rate applies. You receive a separate written quotation for this.
Further reading
- Extension, additional storey or loft conversion Article in German: the three routes to more living space compared.
- What an extension with a building application costs Article in German: design, official fees and building costs shown separately.
- Additional storey: what the structure decides Article in German: walls, floors, foundations and their reserves.
- Loft conversion: costs and permit Article in German: room height, floor, escape route and procedure.
- The preliminary building enquiry in North Rhine-Westphalia Article in German: having individual questions settled bindingly in advance.
- Building without a permit in North Rhine-Westphalia Article in German: what is possible without a procedure and what applies all the same.
What is to be added to your house?
Send me photos, the address and a sketch or two sentences about the project. You receive an assessment of which route fits, and a written quotation.
- First assessment at no fee
- Reply usually within 24 hours on working days
- Written quotation before any costs arise
Calculations and drawings are issued in German, because builders and authorities work with them. You are welcome to write to me in English.