How I plan

Seven sentences you can measure my work by.

First check what carries the load. Then design.


A beautiful floor plan is of little use if the floor cannot carry it. So I look first at what the house can do: walls, floors, foundations. That shows what is possible and in what range the costs will lie. Drawing comes afterwards.

Structural engineering belongs at the design table. Not at the end of the chain.


If the calculation comes last, all it can do is confirm or prevent. At the start it can shape the design: where a column is in nobody’s way, how shallow a beam may be, which wall is not needed at all. Being asked early is the part of my work that saves you the most.

Existing buildings before new build.


What stands has already been built. Material, labour and emissions have gone into it. Whoever demolishes and builds anew pays for them a second time. So I look first at what the house can still do. Sometimes demolition is right all the same. Then it should be the result of a calculation and not a reflex.

The price is settled before I start.


You receive it in writing, as a fixed price or as a quotation with a clear scope. A sum that only emerges at the end is no basis for a decision. If the work takes longer than planned, that is my risk.

Fees and fixed prices in detail →

One person calculates, answers and stands behind it.


That is me. There is no department to which your question is passed on. In construction, things easily fall between two people in charge, so with me there is only one. Where a partner is involved, I say beforehand who takes on what.

Calculate rather than estimate.


A rule of thumb is a guess with a good reputation. Often it is right. In an existing building it simply does not know what was altered before your time. That is why I verify every beam and every bearing by calculation. The result is rarely exciting. But it is correct.

What I plan today, someone must be able to maintain in eighty years.


A house outlives its heating, its windows and often the people who built it. Every component I specify, someone will one day maintain, renew and dispose of. The usual cost calculation ends at completion. I try to think further: with constructions that can still be reached later, and with as few parts as possible. Whether I always succeed, I do not know. I ask myself the question with every drawing.

What follows from this for materials and emissions

Construction has long been drawing up balance sheets. What interests me is what follows from the figure.

Leaving things out is a measure

Every component has a history: raw material, factory, transport, installation. All of that has happened before the heating in the house is switched on for the first time. What is not built, nobody has to manufacture, maintain, replace or dispose of. So with every wall and every beam I first ask whether it is needed. That question is cheapest at the design stage. On site it is expensive.

First the source, then the envelope

When it comes to heat, the first thing settled is what a house will be heated with in future. After that I calculate what walls, roof and windows still have to do. Insulation, too, carries a rucksack of manufacture and transport. Whether it earns that back depends on how clean the heat is that it saves. That is a calculation over the whole service life and not a matter of taste.

The limit: the protection goals

Leaving things out ends where a component protects. A house must stand, allow time in the event of fire, keep out noise and be healthy to live in. I cut nothing from these protection goals, not even for a better balance sheet.