Refurbishing a house: check the fabric first, then plan
Before money goes into the bathroom, floors and insulation, I check what your house can carry and where damp and heat cause problems. After that I plan the refurbishment and calculate structure and building physics myself.
Dipl.-Ing. Robin Henn, civil engineer · design, structural engineering, building physics · Reply usually within 24 hours on working days
Fee
Fee under the German fee scale (HOAI), with a quotation in advance
A refurbishment has no lump-sum price, because no two houses are alike. You receive a written quotation before any costs arise. The way in has a fixed price: the feasibility check for €990 including VAT.
What you receive
- Inspection and written findings on structure, damp and building physics (feasibility check, page in German)
- A clear statement of what is possible, what is not and what comes first
- Design in options with a cost framework
- Structural calculation for every alteration to the structure
- Building physics: thermal insulation, moisture protection, thermal bridges
- Working drawings from which the trades quote and build
- If you wish, tendering and site supervision
Time frame: First assessment usually within 24 hours on working days. Findings of the feasibility check usually within five working days after the inspection.
Note under § 7 HOAI: a fee higher or lower than the values in the HOAI 2021 fee tables may be agreed. Without an agreement in text form the basic fee rate applies.
How a refurbishment is planned
-
Send photos and the year of construction
You send photos, the address, the year of construction and two sentences about the project. I tell you, usually within 24 hours on working days, whether and how I can help. This first assessment is at no fee.
-
Feasibility check in the house
I inspect the house and look at structure, damp and thermal insulation. You receive the written findings usually within five working days after the inspection. The check costs €990 including VAT.
-
Options with a cost framework
The findings lead to options with a cost framework and a sequence of work. For the further design you receive a written quotation under the HOAI.
-
Calculate and, where needed, obtain the permit
I calculate structure and building physics. Where a building application is needed, a partner who is a member of the chamber of architects takes on the permit application (work stage 4).
-
Drawings for the trades
You receive working drawings and details from which firms can quote on a comparable basis. If you wish, I accompany tendering and construction.
What I check before the design begins
Anyone who wants to refurbish a house thinks first of the bathroom, floors and heating. I start with what nobody will see later. Three things decide what a refurbishment costs and in which order it proceeds:
- Structure: floors, load-bearing walls and foundations. Can they carry the loads from a new screed, a new bathroom and a changed floor plan, or are joists and beams damaged?
- Damp: it comes from the ground, through the external wall, from a pipe or as condensation on a cold spot. Each cause calls for a different measure.
- Building physics: the behaviour of heat and moisture in a building element. It decides whether insulation helps or only moves the problem elsewhere.
What is typical depends on the year of construction. In houses from before 1918 it is often timber joist floors and cellars without waterproofing, in buildings of the 1950s sparingly dimensioned elements and balcony slabs in which the steel in the concrete is rusting. For houses from before the asbestos ban of 1993 I also clarify where asbestos may be present in plaster, adhesive or floor covering. The sample is taken by a laboratory.
This check is available as a service of its own: the feasibility check (page in German) with an inspection and written findings for €990 including VAT.
Planning a refurbishment: what comes first?
The sequence follows from the findings, not from the wish list. As a rule it looks like this:
- Secure the fabric: repair the structure, remedy the cause of the damp, make the roof watertight.
- Change the floor plan: open up or move walls while the shell and the pipes and cables are exposed.
- Match envelope and heating: windows, insulation and heat generator belong in one calculation.
- Fit out: screed, bathrooms, finishes.
Anyone who begins with the fourth step often pays for it twice. A typical case: the new bathroom is finished, then it turns out that the timber joist floor beneath it has to be strengthened. How insulation and heating are connected is explained in the article on the sequence of an energy-efficiency refurbishment (in German).
What does it cost to refurbish a house?
Two figures have to be kept apart: the building costs and the fee for the design. For the building costs of a full refurbishment, that is, renewal down to the shell, savings banks and specialist portals give typical figures of around €800 to €2,500 per square metre of living space (as of 2026). Where your house lies within this range is shown only by the survey of the existing building. More on this in the article What a full refurbishment costs (in German).
For the design of a whole refurbishment I do not quote a lump-sum price. The fee follows the HOAI 2021, the German fee scale for architects and engineers, and is set out in a written quotation before any costs arise. Individual services have fixed prices:
| Service | Price incl. VAT |
|---|---|
| Feasibility check: inspection and written findings | €990 |
| Structural calculation for a wall opening, standard case | €536 to €1,131 |
| Thermal bridge, calculation per detail | €262 to €452 |
| Design of the whole refurbishment | Fee under the HOAI, quotation in advance |
How I arrive at a fee is explained on the page Fees.
Refurbishing an old building: what needs a permit?
Much of a refurbishment is exempt from the permit procedure in North Rhine-Westphalia (in German: verfahrensfrei), so no permit has to be applied for: maintenance, new windows, the insulation of roof and façade, the building services. Converting the loft into living space, an extension or a change of use, by contrast, usually go through the building authority. In that case a partner who is a member of the chamber of architects takes on the permit application.
For load-bearing walls in detached, semi-detached and terraced houses a rule of its own applies: the alteration is exempt from the permit procedure if it is certified that structural stability is not endangered (section 62 of the state building code, BauO NRW). For this, the building code of North Rhine-Westphalia requires a certificate from a registered qualified structural designer. Who issues it in your case is stated in the quotation. The calculation for it is my work; more on the page Wall openings.
Exempt from the procedure does not mean exempt from the rules: structural stability, fire safety and local bylaws continue to apply. If the roof covering is renewed completely, the building code has, as a rule, also required a photovoltaic system since 2026; I include its load in the calculation of the roof structure. As of October 2026, building code of North Rhine-Westphalia in the version of 1 September 2026. In each case the building authority decides.
Insulation, heating, subsidies: who does what?
I calculate the building physics: thermal insulation, moisture protection and thermal bridges, that is, the places where heat flows to the outside faster than in the areas next to them. A listed energy efficiency expert is responsible for the subsidised energy advice and the refurbishment roadmap (Sanierungsfahrplan). Subsidy rates are deliberately not on this page, because they change often. You will find the current position in the article Costs and subsidies for energy-efficiency refurbishment (in German).
When a heating system is replaced, the German Building Modernisation Act (GModG, until July 2026 the Building Energy Act) has applied since July 2026; what it requires is explained in the article on the new heating law (in German).
The first step: photos, year of construction, two sentences
Send me photos, the address and two sentences about the project. Also helpful are:
- Year of construction and known alterations
- Any drawings you have, including old building files
- Places that worry you: cracks, damp walls, sagging floors
- Your budget range, if there is one
You receive a first assessment at no fee. I make site visits in Cologne, Bonn, Wesseling, Brühl, Hürth, the Rhine-Erft district and the Rhine-Sieg district. How a first conversation goes is described on the page First consultation.
What I am not the right person for
- New wallpaper, floors and bathrooms that do not touch the structure or the building envelope do not need a civil engineer. A good building firm can do that on its own.
- Subsidised energy advice, the refurbishment roadmap and subsidy applications are not services of mine. They go through a listed energy efficiency expert.
- I do not submit building applications myself. Where one is needed, a partner who is a member of the chamber of architects takes on the permit application.
- I do not quote a lump-sum price for a whole refurbishment before I have seen the house.
Questions about refurbishment
Where do I start if I want to refurbish a house?
With the existing building, not with the floor plan. Structure, damp and thermal insulation decide what the refurbishment costs and in which order it proceeds. The feasibility check for €990 including VAT clarifies this during an inspection and ends with written findings. After that you know what comes first and what can wait.
What does the design of a refurbishment cost?
There is no lump-sum price, because condition and scope differ from house to house. The basis is the German fee scale for architects and engineers (HOAI): what counts are the chargeable costs and the work stages you commission. Under the HOAI 2021, a fee higher or lower than the values in the fee table may also be agreed; without an agreement in text form the basic fee rate applies. You receive a written quotation before any costs arise.
What does it cost to refurbish a house?
That depends on the condition of the house and on how deep the work goes. For a full refurbishment, savings banks and specialist portals give typical figures of around €800 to €2,500 per square metre of living space (as of 2026). According to these sources, hazardous substances, alterations to the structure and listed building status add further to the costs. I only give a figure for your house after the survey of the existing building.
Can a load-bearing wall be removed during the refurbishment?
Often yes, if a beam takes up the load and the masonry at the bearings passes it on; I check that by calculation. In detached, semi-detached and terraced houses (building classes 1 and 2), the alteration is exempt from the permit procedure in North Rhine-Westphalia if it is certified that structural stability is not endangered (section 62 of the state building code, BauO NRW, as of October 2026). For this, the building code of North Rhine-Westphalia requires a certificate from a registered qualified structural designer. Who issues it in your case is stated in the quotation. Whether removing a load-bearing wall completely also counts as an alteration is not expressly settled by the law; if in doubt, an enquiry with the building authority clarifies this. The structural calculation for a single opening costs €536 to €1,131 including VAT in the standard case.
Do I need a building permit for the refurbishment?
For much of it, no: maintenance, new windows, the insulation of roof and façade and the building services are exempt from the permit procedure in North Rhine-Westphalia. Converting the loft into living space, an extension or a change of use, by contrast, usually go through the building authority. Exempt from the procedure does not mean exempt from the rules: structural stability, fire safety and local bylaws continue to apply. As of October 2026, building code of North Rhine-Westphalia in the version of 1 September 2026; in each case the building authority decides.
Who provides the energy advice and makes the subsidy application?
The subsidised energy advice and the refurbishment roadmap (Sanierungsfahrplan) are taken on by a listed energy efficiency expert. I calculate the building physics, that is, thermal insulation, moisture protection and thermal bridges, and coordinate my design with the expert. I deliberately give no subsidy rates here, because they change frequently. You will find the current position in the articles under Knowledge (in German).
Can I stay in the house during the refurbishment?
That depends on the scope. Individual storeys can be refurbished in phases if bathroom, kitchen and heating remain usable in each phase. For work on floor structures, on the staircase or on building elements containing hazardous substances, moving out for a time is usually the better solution. I plan the phases so that it is settled when which room is out of use.
Refurbish, or demolish and build new?
The fabric decides. If structure and cellar are sound, there is much to be said for keeping the house, because the shell is already standing. The balance can tip with walls that are damp right through, hazardous substances on a large scale or a floor plan that cannot be adapted. After the inspection I tell you how I assess your house.
Further reading
- Feasibility check Page in German: inspection and written findings before you plan.
- What a full refurbishment costs Article in German: typical figures per square metre and what they include.
- Energy-efficiency refurbishment: the sequence Article in German: which measure comes first and why.
- Damp wall in an old building: finding the cause Article in German: where the damp comes from and what helps against it.
- Energy-efficiency refurbishment: costs and subsidies Article in German: current figures with date and sources.
- Refurbish or demolish Article in German: the sums before the decision.
Local pages (in German): Rhine-Erft district
Which house do you want to refurbish?
Send me photos, the address, the year of construction and two sentences about the project. I tell you what is possible and which step makes sense first.
- First assessment at no fee
- Reply usually within 24 hours on working days
- Written quotation before any costs arise
Calculations and drawings are issued in German, because builders and authorities work with them. You are welcome to write to me in English.