Home / House design
Having a house designed: conceived from its structure
I design your single-family house so that floor plan and structure fit together, and I calculate structure and building physics myself. The permit application is taken on by a partner who is a member of the chamber of architects.
Dipl.-Ing. Robin Henn, civil engineer · design, structural engineering, building physics · Reply usually within 24 hours on working days
Fee
Fee under the German fee scale (HOAI), with a quotation in advance
The fee depends on the building costs and on the scope of the design. That is why there is no lump-sum price, but there is a written quotation before any costs arise. A worked example with figures is further down this page.
What you receive
- Clarifying the basics: plot, building law, space requirements, budget
- Preliminary design in options with a cost estimate
- Design with a cost calculation
- Structural engineering: structural calculation and drawings for the shell
- Building physics: thermal insulation, moisture protection and sound insulation
- Permit application (work stage 4) by a partner who is a member of the chamber of architects
- Detailed design with details for the trades
- If you wish, tendering, contract award and site supervision
Time frame: First assessment usually within 24 hours on working days.
Note under § 7 HOAI: a fee higher or lower than the values in the HOAI 2021 fee tables may be agreed. Without an agreement in text form the basic fee rate applies.
How the design for your house takes shape
-
Send your plot and your wishes
You send the address or the site plan of the plot, your space requirements and your budget range. I tell you, usually within 24 hours on working days, how I assess the project.
-
Clarify the framework
I check what the local development plan (Bebauungsplan) and the required boundary clearances allow, and clarify size, budget and scope of the design with you. The written quotation under the HOAI is based on this.
-
Preliminary design and design
You receive options in which the structure is already planned in, each with a cost estimate. The option you choose becomes the design with a cost calculation.
-
Building application
The permit application is taken on by a partner who is a member of the chamber of architects; the application is submitted electronically. During this time I calculate structure and building physics.
-
Detailed design and construction
The trades receive drawings and details from which they can quote on a comparable basis and build. If you wish, I take on tendering and site supervision.
What it means to design a house from its structure
Anyone who has a house designed sees floor plans first. What it costs, however, is decided one level below: in the structure, that is, everything that carries loads. If the load-bearing walls on both storeys stand one above the other, the floor manages without a transfer beam. A typical case of the opposite: on the upper floor a load-bearing wall stands right above the middle of the open-plan living room. Then a downstand beam has to carry it, that is, a beam below the ceiling, and that costs steel, room height and money.
I therefore design floor plan and structure in one go. Spans, slab thicknesses and load paths are already settled in the preliminary design and not only after the building application. The same applies to building physics: I calculate thermal insulation, moisture protection and sound insulation as well, while wall build-ups can still be changed.
Who designs what: design, structural engineering, building application
I am a civil engineer, not an architect. Design, structural engineering, building physics and detailed design come from me. The permit application, that is, work stage 4, is taken on by a partner who is a member of the chamber of architects. The German fee scale for architects and engineers (HOAI) divides the design of a building into nine work stages:
| Stages | Content | Share of the fee | Who takes it on |
|---|---|---|---|
| 1 to 3 | Basics, preliminary design, design | 24% | I do |
| 4 | Permit application | 3% | Partner who is a member of the chamber of architects |
| 5 | Detailed design | 25% | I do |
| 6 and 7 | Tendering and contract award | 14% | I do, if you wish |
| 8 and 9 | Site supervision and support after completion | 34% | I do, if you wish |
For a new build, the structural work also includes the proof of structural stability (Standsicherheitsnachweis), which must be with the building authority by the start of construction at the latest. The building code of North Rhine-Westphalia requires it to be prepared by a registered qualified structural designer. Who that is in your case is stated in the quotation. Which designer is the right one in which case is explained in the article Architect or civil engineer (in German).
What does it cost to have a house designed?
There is no lump-sum price. The fee is calculated under the HOAI 2021 and depends on three factors: the chargeable costs, the fee zone and the work stages you commission. What is chargeable is, in essence, the cost of the building construction excluding VAT. Two examples from the fee table for buildings:
| Chargeable costs | All nine work stages | Of which stages 1 to 4 |
|---|---|---|
| €300,000 | €47,577.39 including VAT (€39,981.00 net) | €12,845.90 including VAT (€10,794.87 net) |
| €500,000 | €74,851.00 including VAT (€62,900.00 net) | €20,209.77 including VAT (€16,983.00 net) |
The figures are based on fee zone III, that is, average requirements, and the basic fee rate, without special services (Besondere Leistungen) and incidental expenses (Nebenkosten). Stages 1 to 4 run up to the permit application and make up 27%. Including VAT means here: table value times 1.19.
Structural engineering has a table of its own and appears in the quotation as a separate item. There, 55% of the building construction and 10% of the building services are chargeable: with €300,000 for building construction and €80,000 for building services that is €173,000. For this the table gives a basic fee rate of €10,505.14 including VAT (€8,827.85 net) in fee zone II for work stages 1 to 4.
Why building costs and fee belong together
The fee is calculated from the building costs. Anyone who plans the house smaller or simpler lowers both figures at once. That is why you do not get a fee figure from me without a cost estimate, and no cost estimate without a statement of what it means for the fee.
As to the order of magnitude: the German association of private building clients (Verband Privater Bauherren) gives about €1,800 to €2,500 per square metre for the building costs alone of a single-family house in a standard specification, plus ancillary building costs of 15 to 20% (as of February 2025). The design is part of these ancillary costs. Where savings can be made in the design without the quality suffering is described in the article Cutting building costs without losing quality (in German). What sustainable building changes in the sums is set out in the article Sustainable building and the costs (in German).
Designing a single-family house: what I need to begin with
For a first assessment four pieces of information are enough:
- Address or site plan of the plot, even if you have yet to buy it
- Your space requirements: how many people, which rooms, basement yes or no
- Your budget range for construction and ancillary costs
- The date you would like to move in, if there is one
Send me this information with two sentences about the project. You receive a first assessment at no fee. I design in Cologne, Bonn, Wesseling, Brühl, Hürth, the Rhine-Erft district and the Rhine-Sieg district. How the first conversation goes is described on the page First consultation.
What I am not the right person for
- I do not submit the building application myself. The permit application is taken on by a partner who is a member of the chamber of architects.
- I do not build on a turnkey basis and I am not a property developer. I design and supervise; you conclude the contracts with the building firms yourself.
- I do not design the standard house types of a prefabricated-house manufacturer. There the design is part of the purchase contract.
- I do not quote a fixed price for the design before plot, size and scope are settled.
Questions about house design
What does it cost to have a house designed?
There is no lump-sum price. The basis is the German fee scale for architects and engineers (HOAI 2021); the amount depends on the chargeable costs, the fee zone and the work stages you commission. An example: with chargeable costs of €300,000, the fee table for buildings gives a basic fee rate of €47,577.39 including VAT (€39,981.00 net) in fee zone III for all nine work stages. A fee higher or lower than the values in the fee table may also be agreed; without an agreement in text form the basic fee rate applies.
Is the structural engineering included in the fee for the house design?
No. The German fee scale for architects and engineers (HOAI) lists structural engineering as a service of its own with its own fee table; in the quotation it appears as a separate item next to the building design. An example: if €173,000 is chargeable for the structure, the table gives a basic fee rate of €10,505.14 including VAT (€8,827.85 net) in fee zone II for work stages 1 to 4. Here, too, a fee higher or lower than the values in the fee table may be agreed; without an agreement in text form the basic fee rate applies.
Who submits the building application?
The permit application, work stage 4 in the German fee scale (HOAI), is taken on by a partner who is a member of the chamber of architects. The building application is submitted electronically to the building authority. It is based on my design; I calculate structure and building physics myself.
Do you also take on site supervision?
Yes, if you wish. The German fee scale (HOAI) calls it Objektüberwachung, construction supervision; at 32% of the fee it is the largest of the nine work stages. You can also commission me only up to the detailed design and award site supervision elsewhere.
How quickly is a permit granted for a single-family house?
In the simplified procedure the building authority in North Rhine-Westphalia decides within six weeks once the application is complete and all consultation responses are in. If the plot lies in the area of a local development plan (Bebauungsplan) and the house complies with its requirements, the notification procedure (Genehmigungsfreistellung) is a possibility: construction can then start one month after receipt of the documents if the municipality does not require a permit procedure. As of October 2026, building code of North Rhine-Westphalia in the version of 1 September 2026; in each case the authority decides.
Can I commission individual work stages only?
Yes. The German fee scale (HOAI) allows individual work stages to be commissioned; only the corresponding share is then charged. Stages 1 to 4, that is, up to the permit application, make up 27% of the fee for buildings. The scope is agreed in text form.
What building costs should I expect for a single-family house?
The German association of private building clients (Verband Privater Bauherren) gives about €1,800 to €2,500 per square metre for the building costs alone in a standard specification and €2,500 to €3,500 for a higher specification (as of February 2025). Ancillary building costs of about 15 to 20% come on top. Prices have risen since then: in May 2026 the construction price index for residential buildings was 5.0% above the previous year. A figure for your house is produced with the cost estimate for the preliminary design.
What do you need from me to begin with?
The address or the site plan of the plot, your space requirements and a budget range. If there is a local development plan (Bebauungsplan), I look at it myself. An enquiry is also worthwhile before you buy the plot, if you want to know what can be built there.
Further reading
- The HOAI work stages Article in German: what happens in which stage and what share of the fee it has.
- Architect or civil engineer Article in German: who designs what and who submits the building application.
- Cutting building costs without losing quality Article in German: where saving saves money and where it backfires.
- Sustainable building and the costs Article in German: what it costs and where the balance tips.
- What the structural engineering for a single-family house costs Article in German: structural engineering by the fee table, with examples.
- Fees How I arrive at fees and what has a fixed price.
Local pages (in German): Bonn
Where is your house to stand?
Send me the address or the site plan of the plot, your space requirements and two sentences about the project. You receive a first assessment and, where it fits, a written quotation.
- First assessment at no fee
- Reply usually within 24 hours on working days
- Written quotation before any costs arise
Calculations and drawings are issued in German, because builders and authorities work with them. You are welcome to write to me in English.