General planning: one contract, one contact

As general planner I plan your house or your conversion from a single source: design, structure, building physics, detailed design, tendering and site supervision. Specialist consultants and the permit application are brought in, and you speak to one person.

Dipl.-Ing. Robin Henn, civil engineer · fee under the HOAI fee scale · Reply usually within 24 hours on working days

Fee

Fee under the German fee scale (HOAI), with a quotation in advance

No lump-sum price before I know your project. The fee follows the work stages commissioned and the chargeable costs. I show the surcharge for coordinating the specialist consultants separately in the quotation.

What you receive

  • One contract and one contact for the entire design
  • Design in options, matched to structure and budget
  • Structural engineering and building physics from my office
  • Coordination of the specialist consultants, for example for building services, surveying and ground investigation
  • Permit application (work stage 4) through a partner who is a member of the chamber of architects
  • Detailed design, schedules of work and comparison of the tenders
  • Site supervision with control of costs and deadlines until the final inspection
  • Cost estimate and cost calculation in figures including VAT

Time frame: First assessment usually within 24 hours on working days.

Note under § 7 HOAI: a fee higher or lower than the values in the HOAI 2021 fee tables may be agreed. Without an agreement in text form the basic fee rate applies.

How general planning works

  1. Describe your project

    You send me photos, the address, any drawings you have and two sentences about the project. I tell you whether general planning fits or whether a single service is enough.

  2. Quotation with work stages

    You receive a written quotation. It states which work stages I take on, which specialist consultants are involved and how the fee is made up.

  3. Design, structure and costs together

    I design in options and calculate structure and building physics at the same time. Each option comes with a cost estimate, so that you can decide on the basis of figures.

  4. Permit

    The permit application is taken on by a partner who is a member of the chamber of architects, on the basis of the agreed design. I remain your contact.

  5. Detailed design, tendering, site supervision

    I prepare the drawings the building is built from, put the work out to tender and compare the tenders. On site I supervise the work, the costs and the deadlines until the final inspection.

What a general planner takes on

A general planner is entrusted by the client with all the main design services and brings in further designers for individual disciplines. In my case design, structure, building physics, detailed design, tendering and site supervision are done in my own office. Building services, surveying or ground investigation come from specialist consultants whom I bring in and coordinate. The permit application is taken on by a partner who is a member of the chamber of architects.

For you it remains one contract and one person who answers. Which services I provide myself and which are signed by a partner I bring in is stated in the quotation. A general planner plans and supervises but does not build: you conclude the building contracts with the building firms, on the basis of my tender documents.

Design from a single source: what changes as a result

A typical case: the design shows an open-plan kitchen and living room 6.50 m wide on the ground floor. Above it stands a load-bearing wall of the upper floor. Only the structural calculation shows that this needs a downstand beam that hangs visibly below the ceiling. If the structural calculation is commissioned separately, this is noticed when the design is finished. Then the design is changed.

If design and structure are developed at the same table, the downstand beam is already in the first sketch, or the room is laid out differently. The same applies to building physics. A window reaching down to floor level without a planned junction becomes a thermal bridge, that is, the coldest point of the wall. Points like these cost little as long as they are solved on paper.

Then there is the responsibility. As general planner I answer to you for all the design services covered by my contract, including those of the specialist consultants I bring in.

General planning for a single-family house: when it fits and when it does not

General planning fits if your project needs a building application, involves several specialist consultants and takes months. That applies to a new single-family house, to a full refurbishment and to an extension that alters the load-bearing structure. It also fits if your job leaves you little time and you do not want to take on the coordination between the designers yourself.

Appointing each designer separately is the better choice in three cases:

  • You need only one service, for example a beam design or a written opinion on the existing building.
  • You already have an architect you trust. Then I do the structural calculation and support their work.
  • You want to choose each designer yourself and have the time and experience to do the coordinating.

How the two routes differ in contracts and liability is described in the article General planner or separate appointments (in German).

Civil engineer, not architect: who plans what in my office

I am a civil engineer, not an architect. I design from the structure outwards: first it is settled what carries the load and what building physics requires, and the floor plan follows from that. In existing buildings this is the order that avoids redesign.

If you are looking for a house with a distinctive design signature, an architect who takes responsibility for the design is often the right choice. Then I take on the structural engineering. How the two professions differ is shown in the comparison Architect or civil engineer (in German).

What general planning costs: the HOAI and the surcharge for coordination

I do not quote a lump-sum price for general planning. The fee follows the German fee scale for architects and engineers (HOAI 2021) and therefore the chargeable costs, the fee zone and the work stages commissioned. As a guide for a single-family house: with chargeable costs of €300,000, the fee table for building design in fee zone III gives €47,577 to €59,338 including VAT (€39,981 to €49,864 net) across all nine work stages. Structural engineering and other specialist design services have tables of their own and come on top.

On top of that comes the surcharge for coordination. The HOAI contains no table for it and only requires that it is agreed in text form (section 8 (3) HOAI, as of October 2026). Sources from practice often quote 10 to 20%. What the rate is applied to varies: the total fee or only the specialist services that are passed on. I have not found an official recommendation with a figure. That is why the surcharge appears in my quotation as a separate line, with the basis and the amount.

What the nine stages contain in detail is explained in the article The HOAI work stages (in German).

The smaller way in when nothing is settled yet

You do not have to begin with the whole package. If it is open whether the house can carry your project or whether the purchase is worthwhile, the feasibility check (page in German) settles that for €990 including VAT: inspection, written findings, cost range. If you commission the design within twelve months, I credit the amount in full against the fee.

For the next step, photos, the address and two sentences about the project are enough. I tell you whether general planning fits or whether a smaller scope is enough, for example house design or refurbishment design.

What I am not the right person for

  • I do not submit building applications myself. The permit application is taken on by a partner who is a member of the chamber of architects.
  • I plan and supervise, I do not build. You conclude the building contracts with the firms. I do not replace a general contractor.
  • Subsidised energy advice and the refurbishment roadmap are not services of mine. A listed energy efficiency expert is responsible for those. I do the building physics calculations and the verifications.
  • For a single opening in a load-bearing wall, general planning is too much. For that there is the structural calculation at a fixed price.

Questions about general planning

What does a general planner do?

A general planner is entrusted with all the main design services for a building project under one contract. For individual disciplines the general planner brings in specialist consultants and coordinates them. In my case design, structure, building physics, detailed design, tendering and site supervision are done in my own office. You have one contract and one contact.

General planner or general contractor: what is the difference?

The general planner plans and supervises, the general contractor builds. As general planner I am on your side: I put the work out to tender, compare the tenders and check how the work is carried out. You conclude the building contracts with the firms yourself.

What does general planning cost?

There is no lump-sum price; the fee follows the German fee scale for architects and engineers (HOAI 2021). As a guide: with chargeable costs of €300,000, the fee table for building design in fee zone III gives €47,577 to €59,338 including VAT (€39,981 to €49,864 net) across all nine work stages. Structural engineering, other specialist design services and the surcharge for coordination come on top. A fee higher or lower than the table values can also be agreed; without an agreement in text form the basic fee rate applies.

Is general planning more expensive than appointing each designer separately?

As far as the fee is concerned, as a rule yes: coordination and overall responsibility are paid for, and in return you do not have to do the coordinating yourself. The HOAI contains no table for this surcharge and only requires that it is agreed in text form (section 8 (3) HOAI). Sources from practice often quote 10 to 20%, though what the rate is applied to varies; I have not found an official recommendation with a figure. What it comes to for your project is shown as a separate line in the quotation.

Who is general planning right for, and when are separate appointments better?

General planning fits if your project needs a building application, involves several specialist consultants and you do not want to do the coordinating yourself. Separate appointments are better if you need only one service, already have a designer you trust or would like to choose each designer yourself. In that case I will, if you wish, do only the structural calculation.

Who is liable if a specialist consultant makes a mistake?

Your contract is with me. As general planner I answer to you for all the design services covered by my contract, including those of the specialist consultants I bring in. As a rule you have no contract of your own with the specialist consultants. The details are governed by the contract; in a dispute that is for a lawyer or a court to judge.

Do I need an architect as well?

For the building application yes, and one is already included: the permit application (work stage 4) is taken on by a partner who is a member of the chamber of architects. You do not have to look for anyone yourself. Who provides which service is stated in the quotation.

Can I commission just a part to begin with?

Yes, commissioning in steps is common: first up to the design, then detailed design, tendering and site supervision. Only the shares of the work stages commissioned are then charged. If all you want to know beforehand is whether the project can be done, the feasibility check for €990 including VAT is the smaller way in.

In which region do you take on general planning?

Site supervision needs to be close to the site. I therefore take on general planning in Cologne, Bonn, Wesseling, Brühl and Hürth and in the Rhine-Erft district and the Rhine-Sieg district. If your project lies on the edge of this region, ask me.

Further reading

Local pages (in German): Cologne

What do you have in mind?

Send me photos, the address and two sentences about the project. You receive an assessment of whether general planning fits, and after that a written quotation.

  • First assessment at no fee
  • Reply usually within 24 hours on working days
  • Written quotation before any costs arise